Adler-Alpika Servis Tunnel

Adler-Alpika Servis Tunnel | Eastern Europe

Polyvision partnered with Bautrade and Front Engineering to provide smooth, durable Flexible 3 wall panels for the main road tunnel of the new traffic corridor built for the 2014 Winter Olympics in Eastern Europe. This new transportation route serves as the primary passenger artery for the games, combining railway and road traffic. It extends nearly 48.2 km (30 miles) from Adler Alpica, where the airport is located, and leads into the mountain ski resort Alpika Servis.

Partner:

Bautrade and Front Engineering

Completion Date:

2014

Product Used:

Flexible 3 Panels

Area:

18,000 m2

Architect:

Design Bureau, 'MinskMetroproject'

Project Pictures

Let's Talk

We would love to hear from you! Contact us for sales requests, career information, corporate information, or general questions.