Ubi Station – Downtown Line 3

Ubi Station – Downtown Line 3 | Geylang, Singapore

A combination of Polyvision’s CeramicSteel panels and heavy gauge panels serves as a canvas for an abstract design using various hues of blue and green that covers a portion of the Ubi Station in Singapore. Using CeramicSteel architectural cladding material ensures a long-lasting experience for passengers who move throughout the station, as the colors won’t fade over time and the surface is durable enough to withstand high-traffic environments such as metro stations.

Partner:

CeramicSteel Alliance

Client:

Land Transport Authority

Main Contractor:

SK E&C

Architect:

ONG&ONG

Sub Contractor:

Top Pave Pte. Ltd.

Completion Date:

August 2016

Print Type:

Screen 1

Area of Panel:

650 m2

Product Used:

Standard 2-12

Project Pictures

Let's Talk

We would love to hear from you! Contact us for sales requests, career information, corporate information, or general questions.