Ubi Station – Downtown Line 3
Ubi Station – Downtown Line 3 | Geylang, Singapore
A combination of Polyvision’s CeramicSteel panels and heavy gauge panels serves as a canvas for an abstract design using various hues of blue and green that covers a portion of the Ubi Station in Singapore. Using CeramicSteel architectural cladding material ensures a long-lasting experience for passengers who move throughout the station, as the colors won’t fade over time and the surface is durable enough to withstand high-traffic environments such as metro stations.
Partner:
CeramicSteel Alliance
Client:
Land Transport Authority
Main Contractor:
SK E&C
Architect:
ONG&ONG
Sub Contractor:
Top Pave Pte. Ltd.
Completion Date:
August 2016
Print Type:
Screen 1
Area of Panel:
650 m2
Product Used:
Standard 2-12
Project Pictures
Let's Talk
We would love to hear from you! Contact us for sales requests, career information, corporate information, or general questions.