• Dusk blue a3 CeramicSteel Finished panels from PolyVision used in an elevator lobby of the Dogwood Building of the Tallahassee Memorial Hospital.
  • An elevator landing area at the Tallahassee Memorial Hospital features blue a3 CeramicSteel Finished panels from PolyVision.
  • Elevator entrance area in the Tallahassee Memorial Hospital features blue a3 CeramicSteel Finished wall panels next to silver elevator doors.

Tallahassee Memorial Hospital | Tallahassee, Florida

The experience of patients and their families is essential to the overall healing process in any healthcare environment. It is with this understanding that Tallahassee Memorial Hospital underwent renovations, improving the overall hospital encounter during what is often a challenging time. The project’s architect, Gresham Smith, selected CeramicSteel as the material of choice when designing for the hospital’s new elevator lobbies. Its resistance to bacteria is ideal for the healthcare environment, while its capacity for lasting digital print allows for aesthetically attractive wayfinding graphics. Installed in the rich Dusk blue panel color option, a3 CeramicSteel Finished 3 – 13 Panels flank elevator landings in primary thoroughfares of the hospital.

Partner: Desingtex

Contractor: Brasfield & Gorrie +
Mad Dog Construction

Architect: Gresham Smith

Client: Tallahassee Memorial Hospital

Completion Date: June 2019

Area: 200m2